General Information
Provider
Switch
Colo Space
NULL SF
Airport
N/A
Year Built
N/A
Security
On-site
Uptime
N/A
Hyperscale
Enabled
Retail
Not Available
Wholesale
Available
Interconnectivity
Not Available
Overview
Switch is planning a new facility at 1 Dell Way. At full build, the purpose built facility will deliver a total of 185,000 kW critical load for customer use. The data center is designed for N+1 cooling redundancy to maintain temperature control.
Power & Infrastructure
Power Density
AC and or DC power available, flat rate or based on usage
Utility Feeders
N/A
UPS
null, null
Standby Power
N+1 (Varies by location)
Cooling
N+1 (Varies by location)
Flood Zone
N/A
Seismic Rating
N/A
Fire Suppression
Varies by location
Fire Detection
Varies by location
Amenities
- Private Suites
Other Information
Network Providers
NULL
Media
No media available.
